• Advertising
  • Contact
  • Report the news
Notice
MadeinVilnius.lt
  • News and events
    • City
    • Microdistricts
    • District
      • Trakai
      • Lentvari
      • Carpenters
      • Shirvintos
    • Lithuanian news
    • Foreign news
    • Vilnius people
    • Education
    • Sports
    • tourism
  • Business
    • Vilnius market
    • Construction in Vilnius
    • Real Estate
    • Technologies
    • Foreign investments
    • Startups
  • Entertainment
    • Leisure
    • Events
    • Concerts
    • Festivals
    • Theater
    • Exhibitions
    • China
  • Transport
    • Public transport
    • Vilnius streets
    • Airport
    • Trains
  • Sports
    • Basketball
    • Football
    • Swimming
    • Athletics
    • Tennis
    • Auto sports
    • Manual
    • Hockey
  • Construction
  • Events
  • ○︎
    • History
      • Old Vilnius
      • Vilnius city studio
      • Undiscovered Vilnius
    • Food
      • The best of the capital
      • New place
      • Vilnius people recommend
      • Meals on Wheels
    • Eurovision
    • Weather in Vilnius
    • Horoscopes
    • Style
    • Question of the week
    • The voice of Vilnius
    • List of topics
Personalized
Changing the font sizeAa
MadeinVilnius.ltMadeinVilnius.lt
  • News and events
  • Business
  • Entertainment
  • Transport
  • Food
  • Construction in Vilnius
  • Sports
  • History
  • History of Vilnius
  • Question of the week
Search
  • News and events
    • City
    • Microdistricts
    • District
    • Lithuanian news
    • Foreign news
    • Vilnius people
    • Education
    • Sports
    • tourism
  • Business
    • Vilnius market
    • Construction in Vilnius
    • Real Estate
    • Technologies
    • Foreign investments
    • Startups
  • Entertainment
    • Leisure
    • Events
    • Concerts
    • Festivals
    • Theater
    • Exhibitions
    • China
  • Transport
    • Public transport
    • Vilnius streets
    • Airport
    • Trains
  • Sports
    • Basketball
    • Football
    • Swimming
    • Athletics
    • Tennis
    • Auto sports
    • Manual
    • Hockey
  • Construction
  • Events
  • ○︎
    • History
    • Food
    • Eurovision
    • Weather in Vilnius
    • Horoscopes
    • Style
    • Question of the week
    • The voice of Vilnius
    • List of topics

Discover us

  • Advertising
  • Contact
  • Report the news
  • News and events
  • Business
  • Entertainment
  • History of Vilnius
  • Food
  • Style

Most popular articles

Browse today's top news!

What is happening to Russian speakers in Vilnius? "This is absolutely unforgivable and unacceptable"

16 20

The three zodiac signs with the most difficult personalities

3 1
horoscope

Thursday (July 10) will be a very successful day for two zodiac signs.

2 2

Stay connected

Find us on social networks
130 kfollowersI like it
1.7 kfollowersto follow
7.1 kfollowersto follow
Do you have an account? Log in
  • About us
  • Advertising
  • Contact
  • Privacy Policy
© 2012-2023. UAB "New Media Group". All rights reserved.
Vilnius market

Biofuel facilities of Vilnius cogeneration power plant for 30 million. Euro will be built by Conresta

Made in Vilnius
in 2022 January 27 14:56
2 min. reading
Share

Biofuel burning devices of the Vilnius cogeneration power plant for 30 million. EUR (without VAT) will be installed by the winning construction company "Conresta". 

"Ignitis grupė" reported that they should start supplying heat at the end of this year. Previously, it was planned that biofuel plants would start operating by the beginning of the 2021 heating season.  

"After the contractor completes the planned works, we will be able to provide Vilnius with the first heat produced from biofuel at the end of this year," Mantas Burokas, the general director of the power plant, said in a statement.

According to the contract, which will be signed in the near future, the contractor will complete the construction of the biofuel boiler house, install biofuel unloading, sorting and crushing and other devices, and build structures. It is planned that more than 400 thousand will be burned per year. tons of biofuel.

The construction of biofuel facilities is delayed by about a year. The new tender was announced after the power plant terminated its contract in September 2020 with the restructured Polish boiler manufacturing company Rafako, which became unable to complete the works.

"Ignitis grupė" BNS previously stated that the company performed works worth 107 million. euros, that's how much she was paid. 

In the cogeneration plant, energy has been produced from municipal waste since the end of 2020. After the project is fully implemented, its total electric power should be more than 90 megawatts, and the thermal power should be about 230 megawatts.

The power plant project is financed by the European Union (up to 140 million euros), a loan from the European Investment Bank (up to 190 million euros) and the own funds of "Igničio grupa".

TAGS:ConrestaNewVilnius cogeneration power plant
Share
How do you rate this article?
Really liked it0
Surprised0
Accept0
Boring0
Nonsense0

Recommended videos

- Advertising -

You might also like it

Airport

The number of Israeli tourists in Lithuania will increase: more flights from Israel to Vilnius

4 comments
City

The Ministry and Vilnius will create mobile fire teams

2 comments
1 7
Festivals

SPOT street art festival begins in Vilnius

Comments: 0
2
MadeinVilnius.lt
About Vilnius and the Vilnius region with a new perspective - positively, optimistically, and with a breath of fresh air.
  • About us
  • Advertising
  • Contact
  • Privacy Policy

All rights reserved © 2012-2025 UAB "Naujosios medijos grupė". Copying, reproduction and distribution are permitted only with the written consent of UAB "Naujosios medijos grupė".

wpDiscuz
Welcome back!

Sign in to your account

Username or Email Address
Password

Pamiršote slaptažodį?